BASE: Installing a backup battery system and additional meter socket.
1409 MIDDLEFIELD CT, AUSTIN, TX 78748
Permit Details
- Permit Number
- 2026-108799 EP
- Type
- electrical_permit
- Status
- active
- Issued Date
- September 4, 2026
- Expires
- March 3, 2027
- County
- Austin, TX
Parties
No contractor listed
About electrical_permit Permits in TX
0
electrical_permit permits in TX
Other Permits in AUSTIN, TX
Re-route cold side water line from manifold to kitchen. 10 to 20
1505 SURREY HILL DR · 2026-111307 PP
Johnson/Schultz - 40-10945 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.
13208 LAMPLIGHT VILLAGE AVE · 2026-114599 EP
Furnish and install up to 5 of sewer and drainpipe up to 5 depth.
1411 LARKWOOD DR · 2026-112795 PP
Replacement of complete existing central heat and air system with or without duct work replacement of like for like system
6908 SENECA FALLS LN · 2026-115426 MP
Replacement of complete existing central heat and air system with or without duct work Full gas system replacement with duct
6547 FAIR VALLEY TRL · 2026-111295 MP
Similar electrical_permit Permits
Johnson/Schultz - 40-10945 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.
AUSTIN, TX · 2026-114599 EP
New swimming pool (252 sqft) and concrete deck (158 sqft)
AUSTIN, TX · 2026-057643 EP
(Hansen Jace) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
AUSTIN, TX · 2026-114268 EP
ePlan: Residential Expedited Review - New Autofill/Heated Pool. Unit A
AUSTIN, TX · 2026-046791 EP
ePlan: Residential Expedited Review - New Autofill/Heated Pool. 7012 YATES AVE
AUSTIN, TX · 2026-046792 EP
About electrical_permit Permits in AUSTIN, TX
What is a electrical_permit permit?
A electrical_permit permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on March 3, 2027.
Where does this data come from?
This permit record comes from Austin, TX's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.