Electrical
108 Arlington ST, Boston, MA 02116
$2,600
Estimated Value
Permit Details
- Permit Number
- E1851071
- Type
- Electrical
- Status
- open
- Issued Date
- May 20, 2026
- Expires
- November 20, 2026
- County
- Boston, MA
Parties
- Contractor
- ELTON DAUTI
About Electrical Permits in MA
1,793
Electrical permits in MA
$60,673
Average estimated value
Other Permits in Boston, MA
Similar Electrical Permits
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RE
Mesa, AZ · PMT26-13897
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Mesa, AZ · PMT26-15873
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Mesa, AZ · PMT26-16139
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Mesa, AZ · PMT26-16940
New 24kw Gas Generator Installation of 24kw generator, sub panel, transfer switch, and dedicated gas line. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
Mesa, AZ · PMT26-17453
About Electrical Permits in Boston, MA
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on November 20, 2026.
Where does this data come from?
This permit record comes from Boston, MA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.