Installation of a 60amp breaker for a wall mounted electric vehicle located on the side of the house.
1823 S Rampart St, New Orleans, LA
Permit Details
- Permit Number
- new_orleans_la2-43670
- Type
- electric_vehicle_charger:_electrical
- Status
- issued
- Issued Date
- June 30, 2026
- County
- New Orleans, LA
Parties
No contractor listed
About electric_vehicle_charger:_electrical Permits in LA
0
electric_vehicle_charger:_electrical permits in LA
Other Permits in New Orleans, LA
Pressure test and repair leak
4627 Tchoupitoulas St · new_orleans_la2-24753
vacancy inspection
2309 Clouet St · new_orleans_la2-26072
Vacancy permit. Power has been off for more than 6 months. NO ELECTRICAL WORK UNDER THIS PERMIT. THIS PERMIT IS FOR THE PURPOSES OF AN ELECTRICAL VANCANCY FOR 4328 BAUDIN ST.
4328 Baudin St · new_orleans_la2-31300
Upgrade meter pan and two disconnects 200 amps
5 Swan St · new_orleans_la2-38719
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
554 Amethyst St · new_orleans_la2-7311
Similar electric_vehicle_charger:_electrical Permits
Installation of a 60amp breaker for a wall mounted electric vehicle charger located on the side of the house under the car port.
New Orleans, LA · new_orleans_la2-22671
Installation of 60amp breaker for Tesla EV wall charger for 1225 Second St
New Orleans, LA · new_orleans_la2-34982
Install (2) 3Phase Electric Vehicle Chargers with one new meter and 400A feeder system at a gasoline station on EAGLE STREET.
New Orleans, LA · new_orleans_la2-93488
EV charger circuit and outlet
New Orleans, LA · new_orleans_la2-45646
EV Charger Install Supply and Install Telsa Universal Wall Connector EV Charger Includes Tesla Universal Wall Connector Includes wire 60 amp two pole breaker Includes tandem breakers Includes trenching Any conduit and fittings All labor
New Orleans, LA · new_orleans_la2-12504
About electric_vehicle_charger:_electrical Permits in New Orleans, LA
What is a electric_vehicle_charger:_electrical permit?
A electric_vehicle_charger:_electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.