Demolish existing one family dwelling per plan.
11815 31ST PL NE, SEATTLE, WA 98125
$777,300
Estimated Value
Permit Details
- Permit Number
- 7026869-DM
- Type
- Demolition
- Status
- issued
- Issued Date
- August 26, 2026
- County
- Seattle, WA
Parties
No contractor listed
About Demolition Permits in WA
498
Demolition permits in WA
$9,471,235
Average estimated value
Other Permits in SEATTLE, WA
Construct North townhouse (units 19-23) per plan. (Establish use as rowhouse per land use code. Construct 2 new townhouse buildings per plan. Review & process for 2 records under 6848602-CN).
6715 42ND AVE S · 6848602-CN
Construct tenant improvement project at 399 Fairview Ave. N to reconfiguring full-height demountable partitions in existing office space subject to field inspection STFI.
399 FAIRVIEW AVE N · 7159772-CN
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 26 sheets 1/2" OSB. Install Owens Corning Duration shingles on pitched roof
1108 NW 103RD ST · 7160386-RR
Residential reroof only; no structural changes. Removed existing shingles. No planned plywood replacement but if plywood is needed we will replace with 1/2" CDX. Install IKO Cambridge shingles.
2815 NE 60TH ST · 7160367-RR
Construct MIDDLE SFD per plan [Allow additional single family dwelling unit with detached accessory dwelling units per land use code. Construct as middle NW and NE single family dwellings (SFD); review and process for three (3) records under 7119246-CN].
2642 S MORGAN ST · 7119246-CN
Similar Demolition Permits
Demolish existing warehouse building per plan.
SEATTLE, WA · 7012829-DM
Demolish existing one-family dwelling subject to field inspection (STFI)
SEATTLE, WA · 7106886-DM
Demolish commercial building per plan
SEATTLE, WA · 7129781-DM
Demolish one-family dwelling subject to field inspection.
SEATTLE, WA · 7112264-DM
Demolish existing commercial building per plan.
SEATTLE, WA · 7069218-DM
About Demolition Permits in SEATTLE, WA
What is a Demolition permit?
A Demolition permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Seattle, WA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Seattle, WA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.