AFP26-01284 Previous parent application was submitted (PMT26-05459) This submittal is for adding on the addition of the linen closet. PROJECT IS TO REPLACE THE EXISTING CT EQUIPMENT WITH A SIEMENS SOMATOM EQUIPMENT. AN EQUIPMENT SYSTEMS COMPONENT ROOM WILL BE ADDED WITH A ROOM FINISH REFRESH FOR THE CT EQUIPMENT. ADDITIONALLY, EXISTING DRESSING ROOMS WILL BE CONVERTED INTO A LINEN CLOSET WITH A ROOM REFRESH.
1400 S DOBSON RD, Mesa, AZ
Permit Details
- Permit Number
- PMT26-15613
- Type
- commercial/industrial_projects
- Status
- issued
- Issued Date
- August 26, 2026
- County
- Mesa, AZ
Parties
- Contractor
- BANNER HEALTH SYSTEM
About commercial/industrial_projects Permits in AZ
0
commercial/industrial_projects permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Tenant Improvement to Combine Suites 104 And 106 for Offices, mezzanine for Storage, Open Floor Lab Area
2140 W BROADWAY RD 104 · PMT26-12357
Remove existing carport and construct a new 240 sq ft livable addition with storage and laundry room area, a new 216 sq ft detached storage and 480 sq ft carport and a new 324 sq ft covered patio. Max lot coverage 50% BA02-01. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground electrical and plumbing. Minimum of two 9-ft x 18-ft unobstructed paved, 2-in as
7446 E ARBOR AVE · PMT26-05959
Install one (1) illuminated single-faced alum. logo with routed face ST VP DE 12.5 Sq Ft. Install one (1) set of flat cut out ST. VINCENT DE PAUL MEDICAL CLINIC IN PARTNERSHIP WITH CREIGHTON UNIVERSITY ASU ARIZONA STATE UNIVERSITY 28.9 Sq Ft.
2352 W MAIN ST · PMT26-11537
UNAUTHORIZED CONSTRUCTION. Interior remodel nonstructural. Creation of bedroom, family room and bath under existing roof. Ref: COB26-00191. Minimum required building inspections: Frame, and final. If needed, underground plumbing.
1814 N EDGEWATER CIR · PMT26-12389
Similar commercial/industrial_projects Permits
Ground up 26,000 SF office building. Work to include the building, interiors, mechanical, plumbing, electrical, site civil and landscaping. Deferred fire sprinklers and fire alarm. Civil PMT26-10001.
Mesa, AZ · PMT26-08579
New 3,884 SF Type V-B community center building with a 433 SF covered patio. Occupancies include Groups A-3, B, and S-2. Scope includes offices, kitchen, laundry room, gathering area, storage, and associated MEP systems. Civil improvements under separate permit PMT25-08440. Deferred fire sprinkler system, kitchen hood fire-extinguishing system, and truss calculations. Fire sprinkler monitoring shall be submitted under a separate permit. Special inspections required for structural steel, concrete
Mesa, AZ · PMT25-23753
Install canopy over existing Falcon-1 switchgear inside Falcon Substation.
Mesa, AZ · PMT26-12849
Need to Install 1" meter as this building was part of a rental group and when they were individually sold I have been sharing a meter with 529 E Juanita Ave. New owner would like us to have seperate meters.
Mesa, AZ · PMT26-05303
Installation of a required building fire alarm system related to PMT25-21329.
Mesa, AZ · PMT26-14569
About commercial/industrial_projects Permits in Mesa, AZ
What is a commercial/industrial_projects permit?
A commercial/industrial_projects permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.