DEVELOPMENT FOR NEW SHELL CONSTRUCTION. THE PROPOSED USES ARE APPROVED USEIN PAD ZONING PER CITY OF MESA DEVELOPMENT CODE. WE ARE PROPOSING CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 5,500 S.F. WITH COVERED PATIO 2,044 S.F. OVERHANGS TOTALING 544 S.F. AND OPEN PATIO 400 S.F. Deferred fire sprinklers and fire alarm.
11059 E DESTINATION AUTO DR, Mesa, AZ
Permit Details
- Permit Number
- PMT26-11315
- Type
- commercial/industrial_projects
- Status
- revisions required
- Issued Date
- September 29, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Tyler Kazimierczuk
About commercial/industrial_projects Permits in AZ
0
commercial/industrial_projects permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Civil improvement plans only. REF: PMT26-08579 for bldg. Water Meters: (1) 1-inch landscape.
5118 S 71ST ST · PMT26-10001
14x18 BBQ Ramada with a gas cooktop and sink and a 18x18 RV Cover with no utlities
1042 N RIDGE CIR · PMT26-12225
DH 224: Install 250' of drywall floor to ceiling (125' on each side) to create cooling equipment gallery. DH 227: Install 500' of drywall floor to ceiling (250' on each side) to create cooling equipment gallery All work to include necessary rough openings for fan wall and chilled water piping. All necessary doors and fire extinguishers indicated in the plans will also be install
8807 E WARNER RD · PMT26-12295
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 56-FT 1987 PALH MANUFACTURED HOME. ABOVE GROUND SET, SERIAL NO. ASIS034X AND ASIS034U, WITH A/C ON THE SIDE. GAS IS MASTER METERED. ONE 10-FT X 40-FT AWNING PER ICCESR 1953. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100 PERCENT OF THE MH FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE MH. PER SECTION 11-34-2-B OF THE MESA ZONING ORDINANCE, AMENDED IN JULY 2025. NO OTHER ACCESSORY STRUC
9310 E MAIN ST 209 · PMT26-12044
Similar commercial/industrial_projects Permits
Civil improvement plans only. REF: PMT26-08579 for bldg. Water Meters: (1) 1-inch landscape.
Mesa, AZ · PMT26-10001
Construction of a new 4,975 SF, construction type V-B, B and S-1 occupancy, one-story Brakes Plus motor-vehicle repair facility consisting of customer sales/waiting, office and employee support areas, inventory/storage, and vehicle service bays. Work includes site improvements, foundations and structural, MEP's, vehicle lifts, automotive service equipment, and finishes. New (1) 1-inch landscape meter and (1) 2-inch domestic meter. Deferred fire sprinklers and prefabricated trusses. Special inspe
Mesa, AZ · PMT26-11534
The project includes a new 4-story Candlewood Suites hotel based on prototype version 4.2B dated June 14th, 2024. The hotel will feature 103 guest rooms designed to provide comfortable, extended-stay accommodation for visitors, staff, and guests attending spring training activities. The project is situated on the same site as the Cubs Housing facility. Deferred fire sprinklers, fire alarm/detection systems, access control.
Mesa, AZ · PMT26-11246
Addition of new distribution panels HPP5 and HPP6 along with equipment connections from panels
Mesa, AZ · PMT26-04986
The project consists of the development of a new shops building and the associated paved access, parking, utility, and drainage infrastructure. No landscape meter. REF: PMT26-11817 Building permit.
Mesa, AZ · PMT26-12926
About commercial/industrial_projects Permits in Mesa, AZ
What is a commercial/industrial_projects permit?
A commercial/industrial_projects permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.