PermitDig
ElectricalFinaled – c of c required

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

1013 S REVERE, Mesa, AZ

Permit Details

Permit Number
PMT26-06854
Type
Electrical
Status
finaled – c of c required
Issued Date
June 2, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Emeli Langi

Want alerts when similar permits are filed?

Set Up Alerts