New 890 SF detached ADU with a 155 SF front porch. Includes Mechanical, Plumbing and Electrical improvements. Includes a new 200A electric service panel. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electric final, plumbing final and final.
2035 W DECATUR ST 101, Mesa, AZ
Permit Details
- Permit Number
- PMT26-14902
- Type
- additions
- Status
- fees due
- Issued Date
- September 24, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Cristian Arroyo
About additions Permits in AZ
0
additions permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
1451 E BROWN RD · PMT26-12464
Install canopy over existing Falcon-1 switchgear inside Falcon Substation.
5000 E MCDOWELL RD · PMT26-12849
The project consists of the development of a new shops building and the associated paved access, parking, utility, and drainage infrastructure. No landscape meter. REF: PMT26-11817 Building permit.
9257 E SERENITY AVE · PMT26-12926
Interior alterations to existing Buildings 1, 4, and 5, including remodel of the existing café in Building 1, interior renovations to Buildings 4 and 5, a 24-sf addition to Building 5, and new steel entry canopies at Buildings 4 and 5 totaling 631 sf. Type V-B construction, A-3 occupancy. Building 5 interior separation wall 2-hour fire-resistance-rated assembly to remain, new code required 1-hour corridor in building 5 North. New grease interceptor. Deferred fire alarm. Special inspection requir
2130 E UNIVERSITY DR 5 · PMT26-13047
Similar additions Permits
Building a detached 576 SF building in the rear yard to be utilized as a gymnasium with some Mechanical and Electrical improvements. Unpermitted awning to be part of this permit 1,026 sq ft. Minimum required building inspections: footing, stem, strap/shear, frame, mechanical rough in, electric rough in, insulation, drywall shear, mechanical final, electric final, and final.
Mesa, AZ · PMT26-13148
Install a new 14' x 9' aluminum patio cover/pergola at the rear of the existing single-family residence. Work includes aluminum roof panels, support posts, beams/header, required footings/anchors, and associated electrical/gas work shown on the plans. Structure to be installed per Duralum manufacturer requirements, IAPMO UES ER-195, and City of Mesa applicable codes.
Mesa, AZ · PMT26-16658
An addition of two bedrooms and one full bathroom
Mesa, AZ · PMT26-17211
Convert existing 940 SF 3-car garage into ADU. Includes some mechanical, plumbing and electrical, improvements. Minimum required building inspections: Footing, stem, frame, mechanical rough in, electric rough in, plumbing rough in, insulation and final.
Mesa, AZ · PMT26-07477
Attached Metal Building with Electric
Mesa, AZ · PMT26-17143
About additions Permits in Mesa, AZ
What is a additions permit?
A additions permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.